Plus Power, which recently relocated its HQ to Houston, has moved into a larger office space. Image via cushmanwakefield.com

A Northern California-born energy storage startup has established its headquarters in The Woodlands.

Plus Power, which develops battery systems designed to store backup power for electric grids, recently signed a lease for nearly 7,000 square feet at Three Hughes Landing in The Woodlands. The company previously was based in coworking space at the Rayford Office Park in Spring.

The company, founded in 2018, shifted its headquarters from San Francisco to the Houston area last year.

“We chose The Woodlands for its beauty, and walkable access to great nearby hotels, restaurants, and healthy groceries,” says Brandon Keefe, CEO of Plus Power. “A Houston base reflects our deep focus on the Texas market, as we are investing nearly $1 billion in several projects here that will be online by the first quarter of 2024, with more in [the works] behind that.”

About 40 employees work from Plus Power’s new office in The Woodlands. Across North America, the company employs about 130 people, including several in Austin. As of July 10, the startup listed nine job openings.

Plus Power develops, owns, and operates utility-scale systems that store energy in huge lithium-ion batteries during low-demand periods. In times of peak demand, power providers can tap into this stored energy.

“Standalone energy storage is rapidly transforming the U.S. energy markets, because it is cheaper than new natural gas plants, faster to build than fossil peakers or transmission, and able to perform diverse energy services,” the company explains in its job postings.

Peakers are backup power plants that run on fossil fuels.

One of Plus Power’s storage facilities is the 100-megawatt Gambit project, which opened two years ago in Angleton. The nearly eight-acre facility supports power supplies for the Electric Reliability Council of Texas (ERCOT), which runs the power grid for 90 percent of Texas.

The company says the Angleton facility has fed backup energy to ERCOT during this year’s and last year’s heatwaves, as well as last December’s winter freeze.

The Gambit facility might ring a bell with some folks in the Houston area. In January 2022, Austin-based automaker Tesla unveiled a backup power storage facility in Angleton. Plus Power bought the project from Tesla in June 2022.

Plus Power’s development pipeline contains 10 gigawatts’ worth of energy storage projects in 28 states and Canada. That includes massive projects on tap for Hawaii and Arizona.

Last November, Plus Power announced it had secured $219 million in debt financing for construction of the 185-megawatt Kapolei project on a roughly eight-acre site in Oahu, Hawaii. The facility will be tied to Hawaiian Electric’s power grid. Mizuho Securities USA and KeyBank led the financing.

This April, Plus Power held a groundbreaking ceremony for the Sierra Estrella project in Tolleson, a Phoenix suburb. The 250-megawatt system will serve Salt River Project (SRP), a utility provider in the Phoenix area. The roughly 11-acre Tolleson facility is set to open next year, as is another Plus Power project for SRP — the 90-megawatt Superstition facility in Gilbert, another Phoenix suburb.

As its development pipeline demonstrates, Plus Power is firmly plugged into the fast-growing energy storage market.

According to the Houston-based energy research and consulting firm Wood Mackenzie and the American Clean Power Association, the U.S. energy storage market installed a record-breaking 4.8 gigawatts of capacity in 2022. This year, that number is projected to approach 75 gigawatts.

In a March 2023 news release, John Hensley, the clean power group’s vice president of research and analytics, says the U.S. market “is on a rapid growth curve and is already a key component of building a resilient grid that supports abundant clean energy.”

------

This article originally ran on EnergyCapital.

Ad Placement 300x100
Ad Placement 300x600

CultureMap Emails are Awesome

Rice, Houston Methodist award $90K for cancer research projects

seed grants

Rice University’s Synthesis X Center, in partnership with the Houston Methodist Neal Cancer Center, announced earlier this month the organizations would award $90,000 in seed grant funding to two projects that could help fight cancer. One would ease the pain of chemotherapy, while the other could change the way the progression of leukemia is tracked.

“We’re excited to be collaborating with the Neal Cancer Center to support collaborative, novel and interdisciplinary proposals to improve cancer care and outcomes,” Han Xiao, Rice professor of chemistry and the director of the SynthX Center, said in a news release. “Together, we can achieve translational excellence.”

The projects

Chemotherapy is one of the most effective cancer treatments, but it can be hard on the body. The human body doesn’t like being injected with radioactive material, especially the skin around the injection point, which can become extremely irritated. For patients in long-term treatment, the skin irritation can be more than just a bother; it can lead to infections that are dangerous to a compromised immune system.

Angel A Marti, a professor of chemistry at Rice University, and Biana Godin, an associate professor of nanoscience at Houston Methodist Research Institute, are experimenting with metal nanoclusters as a way to block radiation at the injection site. The nanocluster could be applied in a cream or a gel on the skin, serving as a type of shield against the harsh radioactive material.

Meanwhile, Yuan Ma, an assistant professor of chemistry at Rice, and Shu-Hsia Chen, a professor of immunology at Houston Methodist Research Institute, are working with m6A. Discovered in the 1970s, m6A is the most prevalent chemical modifier found in mRNA in mammals. It is prevalent in many cancers, including leukemia.

Ma and Chen are working on measuring the amount of m6A in leukemia to see if it can determine the most effective cancer treatments. The team is also experimenting with ways to shut off m6A to see if it makes current leukemia treatments more effective.

Progress from SynthX

SynthX was first launched in April 2024 to turn research from Rice and Houston Methodist into real-world cancer treatments. Within a year, the center had secured $1.5 million in grant money to work on crossing the blood-brain barrier in brain cancer treatments. These latest awards show that SynthX Center continues to bridge the worlds of research and clinical practice.

“This collaboration reflects a shared commitment to team science in cancer research,” Daniela Matei, the director of the Houston Methodist Neal Cancer Center, added in the release. “These are the types of translational and pioneering projects that lead to transformation in patient care.”'

The SynthX Center awarded $90,000 in seed grants to three teams in 2025 and $80,000 to three teams in 2024.

Tesla self-driving mode wasn't to blame in Houston-area crash, report suggests

Tesla news

Federal safety investigators looking into a runaway Tesla that killed a grandmother in her home say the driver had pressed the accelerator to full speed, suggesting the vehicle's self-driving software was not to blame.

The driver had told police that he had the self-driving software turned on, but a report from the National Transportation Safety Board concluded that he had actually overridden that feature when he pushed hard on the pedal. Moments later the Tesla Model 3 raced down a residential street in Katy, Texas, at highway speeds, slammed into a brick home and killed a 76-year-old woman standing in the front room.

The crash last month drew national attention because Tesla CEO Elon Musk is seeking to reassure the public its self-driving feature is safe as he prepares to turn hundreds of thousands of Teslas already on the road into fully automatic vehicles and begin selling two-seated Cybercabs missing steering wheels and pedals.

The crash came two months after officials at a separate federal agency, the National Highway Traffic Safety Administration, announced it was elevating a 2024 investigation of the self-driving feature to new “engineering analysis” level, raising the possibility of a recall of 3.2 million Tesla vehicles.

That NHTSA probe was triggered by crashes where the self-driving feature failed to alert drivers to take control in fog and other poor visibility conditions.

The agency opened an investigation last year into 58 incidents in which Teslas reportedly violated traffic safety laws while using self-driving technology, leading to more than a dozen crashes and fires and nearly two dozen injuries.

Separate from the National Transportation Safety Board, NHTSA is also looking into the Tesla house crash in Texas, one of 46 “special crash” investigations of Tesla's self-driving or driver-assistance technology in the past decade, according to the agency’s records. In more than a dozen of those crashes, at least one person — a driver, passenger or pedestrian — was killed.

Tesla had originally called its driver assistance software Full Self-Driving, or FSD, but auto experts and regulators complained it was misleading because drivers must always keep their eyes on the road and be ready to take over at any time.

The company has since changed the name to Full Self-Driving (Supervised).

Video of the Katy, Texas, accident shows the Tesla traveling at more than 70 mph (112.65 kilometers per hour), jumping a curb then tearing across a lawn before crushing through a brick wall of a home. A woman standing feet away, Martha Avila, was found amid piles of crumbling plaster, split beams and bits of furniture and rushed to a hospital but died.

Sales of Tesla cars still haven't recovered fully from boycotts last year over Musk's political stands, but the stock is rising anyway as he has successfully shifted attention away from the sales figures. He says they matter less now that the company is on the cusp of major technological advances, such as turning Teslas into hands-free vehicles and having its Optimus robots take over for humans for tasks at home and work.

Tesla stock has risen 22% in the past year and is currently trading at 170 times expected annual earnings compared to 20 for the S&P 500.

For its second-quarter financial results, financial analysts surveyed by FactSet expect earnings per share will barely budge — 32 cents versus 33 cents a year earlier — continuing a sixth quarter streak of flat or falling profits.

London AI startup selects Houston for first U.S. office after $20M raise

welcome to houston

London-based AI firm Applied Computing has announced a $20 million Series A round and a new office in Houston.

The new Bayou City office is Applied Computing’s first in the United States and part of its North American expansion. The company is known for its Orbital AI platform, which is tailored for energy operations.

The funding round was led by Houston-based KBR Inc., with participation from San Francisco-based Databricks Ventures. KBR’s investment was first announced in March.

KBR and Applied Computing have also entered into a multi-year agreement to deliver exclusive AI products for the energy sector. KBR already has integrated Orbital into its INSITE 3.0 platform for energy projects, and is also using the product for ammonia production.

Applied Computing’s Orbital platform combines physics-grounded intelligence with models across chemical engineering, time-series forecasting and language, according to the company. The system analyzes sensor readings and can recognize a facility’s equipment constraints and operator activity. The platform can also allow technicians to run simulations of how a change to a facility could affect the rest of its operations.

According to TechCrunch, Applied Computing will use the $20 million to further explore projects and deployments with the energy sector, hire engineering and research positions, and continue to expand internationally, potentially into the Middle East.

The company is also working on deals with a major U.S. stream operator, TechCrunch reports. And Applied Computing shared on LinkedIn that it plans to announce its first partnership with a major European oil company in the coming weeks.

“Yesterday we showed Orbital live in deployments at our demo day at the Energy Institute in London,” Callum Adamson, CEO and co-founder of Applied Computing, posted on LinkedIn on July 16. “Today, we're announcing the capital to scale it globally as well as the launch of our new offices in Houston and Bangalore. In the weeks following, there will be more announcements on our progress, partnerships and deployments.”

The company opened its Bangalore offices in December.